Preview build: not live, not indexed.

Home / Guides

Epoxy Floor Projects: What Affects Cost and Timeline

Updated

Every floor is different, so we quote after seeing photos or the slab itself. These are the factors that move the price and the schedule.

What affects cost

  • Size of the area (larger areas usually cost less per square foot)
  • Slab condition: cracks, pitting, old coatings or sealers to remove
  • Moisture issues that need a special primer
  • The system: solid colour, flake, metallic, thickness and topcoat
  • Access, stairs, and how much needs moving out

Timeline

Most garages take one to a few days on site, plus cure time before you park. Commercial jobs are scheduled around your operations.

Get a real number

Send the size, the city, and a few photos through our quote form, and we'll come back with next steps.

Request a quote · More questions answered

Ready to talk about your floor?

Send the size, city and a few photos, and we'll get back to you with next steps.

Get a quoteCall 778-952-0221

Call nowGet a quote